Banner
Intranet Home Page Administration Company Information Client Information Safety Management Environmental
Quality Assurance  Industrial Relations  Marketing                   Forms                       Training Library and Links 

 

KAGARA ZINC HOME PAGE

Mt Garnet Open Pit / UndergroundKagara

Kagara commenced base metal production in North Queensland through a trial mining exercise of the Mt Garnet open pit, adjacent to the Mt Garnet treatment facilities.

The Mount Garnet open pit was completed in June 2008 and a portal for the development of the underground ore body commenced in March 2008. Development ore became available for treatment in February 2009.

Balcooma Open Pit /DryRiver South Underground

Mining of the rich Surveyor pit commenced in 2003 and proved to be a company-maker for Kagara. Subsequent exploration delineated the high-grade Dry River South underground base metal deposit, which is now mined from a decline off the side of the Surveyor pit.

An exploration decline to access the Dry River South extension was developed during 2009. However, Kagara decided to suspend polymetallic development and mining operations at both Dry River South and the nearby Balcooma underground mines in late 2008 in response to the prevailing economic climate.

The rehabilitation of the Dry River South decline was completed in late 2008 and both operations have been placed on care and maintenance.

http://www.kagara.com.au/

Kagara Zinc supplied documents:

Village Occupancy Rules

Mungana Tank Project Specifications:

Description Specification
Protective Coatings Protective Coatings Tech Spec_Rev 4
Structural Steel Work Structural Steel Tech Spec_Rev 0
Contract Specification - For Supply of Wet Plant Plate Work & Tanks Contract Specification_Rev 0